Prefab/Modular/Hospital Activity Room/Dormitory Labor Hotel/Portable Container House

Product nameSteel frame container houseSteel StructureFrame: 1)Q235 Strip Steel Hot rolled galvanized, anti-corrosive coating, Thickness: 2.5/2.7/3.0 mm 2) Corner post: Galvanized,anti-corrosive2.5/ 3.0mm 3) Connection: high-strength bolt M12*40Wall PanelV950 50mm Rock wool sandwich panel (80kg/m3) 1150 75mm glass fiber sandwich

Featured Products

Prefabricated/Modular/Movable House for Hospital/Dormitory Labor Hotel/Portable Shipping Container House
Product nameSteel frame container house
Steel StructureFrame: 1)Q235 Strip Steel Hot rolled galvanized, anti-corrosive coating, Thickness: 2.5/2.7/3.0 mm 2) Corner post: Galvanized,anti-corrosive2.5/ 3.0mm 3) Connection: high-strength bolt M12*40
Wall PanelV950 50mm Rock wool sandwich panel (80kg/m3) 1150 75mm glass fiber sandwich panel (50kg/m3) 0.5mm steel sheet Fire rating: A
Roof1) Roof: 0.5mm colored-steel sheet (Color: Grey or optional) 2) Roof Insulation: 0.5mm colored steel sheet +100mm glass wool
insulation, density 16KG/m³, Fire rating: A 3) Purlin: Section C80 Glvanized Steel. Thickness: 1.2mm 4) Ceiling:Steel
self-connected ceiling (0.5mm colored-steel)
Floor1)Bottom frame is pre-installed   2) 18mm fiber cement board 
3) 2.0mm PVC leather. 4) 100mm glass wool insulation (16kg/m3) (optional)
DoorSteel door, High quality press lock Size: 840x2030mm
Prefabricated/Modular/Movable House for Hospital/Dormitory Labor Hotel/Portable Shipping Container House
Prefabricated/Modular/Movable House for Hospital/Dormitory Labor Hotel/Portable Shipping Container House
Prefabricated/Modular/Movable House for Hospital/Dormitory Labor Hotel/Portable Shipping Container House

1. Are you a factory or trading company?
our is a factory located in China.

2. What's your delivery time?
Normal order delivery time is 2-30 days after receive deposit.
Big order delivery time should confirm with order management dept.

3. What is your terms of payment ?
30% deposit in advance, balance before shipment.

4. Is it difficult to build a prefab house?
Easy to install, installation video and guide book send to you showing how to fast installation.
Or we can send engineer or installation team to construction site.

5. Do you provide on-site installation service?
Big projects provide installation services, Installation charge standard: 150USD/day, customer charge travel fee, accommodation, translation fee, and ensure staff's health and safety.










 

Contact us

Please feel free to give your inquiry in the form below We will reply you in 24 hours